> * Tom Zanussi (
tzanussi@gmail.com) wrote:
> [...]
> > IIRC, I think the conclusion we came to was that it could be done
> > mechanically if for example the right-hand-side of an assignment in
> > TP_fast_assign() only involved a simple variable assignment, but as
> > Steve pointed out, some assignments are more complicated than that.
>
> Yep, we came up to the same conclusions in UST.
>
> > For example, in the sched_switch tracepoint assignments:
> >
> > __entry->prev_prio = prev->prio;
> > __entry->prev_state = __trace_sched_switch_state(prev);
> >
> > so the prev_prio should be able to be tested 'in-line' but the
> > prev_state would require a temporary buffer to write the value into
> > before doing the test as mentioned by Steve. At which point you're no
> > further ahead (in that case) than the current situation...
>
> if we change all assignments to, e.g.:
>
> _tp_assign(__entry->prev_prio, prev->prio)
> _tp_assign(__entry->prev_state, __trace_sched_switch_state(prev))